KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
Work Logs Found: 60
Category Work Time: 52 Hours
 Date
Hours
Work Log Summary

Details

 04-15-2016
2.00
Venting System
Details
       

 04-15-2016
0.00
Venting System
Details
       

 04-14-2016
2.00
Venting System
Details
       

 04-13-2016
1.00
Venting System
Details

 03-25-2016
3.00
Venting System
Details
       

 03-12-2016
3.00
Venting System
Details
       

 03-12-2016
3.00
Venting System
Details
       

 03-11-2016
5.00
Venting System
Details
       

 03-10-2016
6.00
Venting System
Details
       

 03-10-2016
0.00
Venting System
Details
       

 03-10-2016
0.00
Venting System
Details
       

 02-29-2016
6.00
Fueltank Installation
Details
       

 02-29-2016
0.00
Fueltank Installation
       

 02-25-2016
5.00
Fueltank Installation
Details
       

 02-25-2016
0.00
Fueltank Installation
       

 02-21-2016
1.00
Fueltank Installation
Details
       

 02-17-2016
6.00
Fueltank Installation
Details
       

 02-17-2016
3.00
Fueltank Installation
       

 01-21-2012
0.00
Tank Air Test
Details
       

 01-21-2012
0.00
Tank Air Test
Details
     

 01-20-2012
0.00
Sealant Types
       

 01-20-2012
0.00
Painting the Innner Side with Fuel Resistant Resin
Details
       

 01-18-2012
0.00
Taking the Tank out of its Jig
       

 01-17-2012
0.00
Laminating Tankdeck
       

 01-16-2012
0.00
Bonded Tank into the Tank Deck
       

 01-06-2012
0.00
Smoothened up Surfaces for Best Sealant
       

 01-06-2012
0.00
Painted Innerside of Tank with Fuel Resistant Resi
Details
       

 12-22-2011
0.00
Ram Air Tube Installation
       

 12-21-2011
0.00
Ram Air Hose Installation
       

 12-20-2011
0.00
Tank Filler Cap
Details
       

 12-19-2011
0.00
Tank Water Test
Details
       

 12-19-2011
0.00
Tank Water Test
Details
       

 12-15-2011
0.00
Bonding the Tank Sump to the Tank
       

 12-12-2011
0.00
Bonding the Tank Sump to the Tank
       

 12-06-2011
0.00
Tank Sump
Details
       

 12-06-2011
0.00
Tank Inspection Panel
       

 12-05-2011
0.00
Tank Sump
       

 12-03-2011
0.00
Tank Sump
Details
       

 12-03-2011
0.00
Tank Sump
       

 12-03-2011
0.00
Fuel Sump Connectors
       

 12-02-2011
0.00
Tank Sump
Details
       

 11-30-2011
0.00
Laminating the Sump
       

 11-28-2011
0.00
Tank Sump
       

 11-23-2011
0.00
Vacuum Bagged the Bottom with Glass
Details
       

 11-18-2011
0.00
Installing the Tank Bottom
Details
       

 11-16-2011
0.00
Fitting the Walls to the Deck
       

 11-03-2011
0.00
Filler Cap Bonding
       

 11-03-2011
0.00
Building the Tank together
Details
     

 11-02-2011
0.00
Filler Cap Fitting
Details
       

 10-31-2011
0.00
Filler Cap Fitting
       

 10-29-2011
0.00
Filler Cap
       

 10-27-2011
0.00
Filler Cap
       

 10-05-2011
0.00
Tank Inspection Panel
       

 10-05-2011
0.00
Bonding the Insopection Panel
Details
       

 09-30-2011
0.00
Tank Inspection Panel
       

 09-30-2011
0.00
Tank Inspection Panel
       

 09-29-2011
0.00
Laminating Tank Deck and Walls with Vacuum
       

 09-27-2011
0.00
Cutting the Peel Ply and Breather
     

 09-27-2011
0.00
Cutting the Foam
       

 07-30-2011
6.00
Building the Jig
       










Copyright © 2001-2024 Matronics. All Rights Reserved.